Customization: | Available |
---|---|
After-sales Service: | Free Technical Support |
Warranty: | None |
Still deciding? Get samples of US$ 300/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Aluminum Formwork System is a construction system for forming cast in place concrete structure of a building. It is also a system for scheduling and controlling the work of other construction trades such as steel reinforcement, concrete placement and mechanical and electrical conduits.
1. Light weight, less than 19KG/M2
2. The construction is convenient, and the aluminum building formwork is easy to assemble, which can be assembled manually, or assembled into pieces and then hoisted by machinery as a whole.
3. Standardized construction, high turnover times, normal use can reach 300 times.
4. It has a wide rang of applications. Use of wall formwork, horizontal floor slab, column, beam, climbing formwork and other formworks for aluminum building formwork.
5. The construction period is short, 2-3 times faster than the general formwork construction.
6. The bearing capacity is large, and the aluminum formwork can bear 60KN per square meter.
7. High recycling value. The residual value of aluminum construction formwork is high, and the average cost advantage is obvious.
NO. | Capability | Capability Introduction |
1 | Loading Capacity | 60KN/M2 |
2 | Construction Cycle | 5 Days/ floor |
3 | Construction Efficiency | 10-30M2/ day / person |
4 | Using Times | 300 Times |
Contains standard sizes and accessories and can be designed differently depending on the size of the structure. It is widely used in construction and greatly improves the construction efficiency.
Light Weight
Made of aluminum alloy 6061-T6,it's average weight is around 25kg/, easy to be carried manually
Flexible Operation
The system can be lifted by tower crane as a whole,or dismantled and installed by labors.It allows casting of wall, beam, slab and staircase monolithically or by two stages.
Long reusing life
The panel is made of extrusion profiles which is high strength and not easy to be deformed or oxidated, the reusing time can reach up to 300 times.
Save labor cost
Panels are connected by pin&wedges, un-skilled labors can install and dismantle the system by hammers only.
Shorten construction period
Early-stripping application improve the system cycle and save cost for users.After pouring of concrete, wall panels could be stripped in 12 hours and slab panels 24-36 hours, finish one floor by four days only.
Improvement of work environment
The system fabricated at factory and requires only installation at site keeps the work environment clean and safe.
We are engaged in solving the whole solution of building construction, a collection of Aluminum Formwork, Aluminum Scaffolding, Aluminum Beam company
And We can provide R&D, design, production, leasing, sales,in professional construction in one comprehensive compa
Tianjin Easy Scaffolding Co., Ltd is a scaffolding manufacturer and export company.
1. who are we?
We are based in Tianjin, China, start from 2017,sell to Southeast Asia(45.00%),Mid East(20.00%),Africa(5.00%),Eastern Asia(5.00%),Western Europe(5.00%),Central America(5.00%),South Asia(5.00%),North America(4.00%),South America(3.00%),Northern Europe(3.00%). There are total about 11-50 people in our office.